AK Logo (blue) NBS

AK DESIGN PARTNERSHIP LLP

School Extension, South London

• Contract Value: £1.5m
• Contract duration: 30 weeks
• AKDP Appointment: Architectural Design Consultants

Working with a Partnering Contractor and the Local Authority, AKDP developed this scheme through Building Control and the construction phases on a very difficult terrain.

The new build included 4 classrooms and toilet facilities for disabled pupils as part of 'Schools for the Future' initiative.

AKDP prepared all general arrangement setting out and working drawings, including temporary crane bases, foundations, retaining walls, columns, concrete floors and superstructure together with a Greenroof construction and cedar cladding.